Project

Martin Linge

allrad.pl realizacje

Our company’s task was the prefabrication of 1,000 meters of commercial pipelines up to 2” including its installation on the vessel.

This work required the highest quality of craftsmanship, each stage was controlled by QC, from the preparation for welding to post-welding inspections to NDT tests and the verification of proper installation on the vessel.

Thanks to the high-quality implementation, internal quality control, and carefully prepared documentation, we completed the project on time.

 

The scope:

  • a) Heating system for processing tanks
  • b) Steam & Condensate – Engine room
  • c) Compressed air system
  • d) Winter Diesel Oil transfer
  • e) Cargo Oil storage tanks
  • f) Freshwater cooling system
  • g) crude oil system